Aedas - home

Hide Content [ - ]

Cosco-HIT Terminal 8 East

Hong Kong

The Terminal 8 East project consists of an administration/ maintenance building of approximately 20,000m2 gross floor area, two gatehouses and canopies of 1,500 m2 gross floor area each, LPG store, underground diesel tanks and pump installation, civil works and ancillary facilities. The site was reclaimed land which required careful staging to enable the building construction to keep pace with the land availability.

The administration/ maintenance building was designed for maximum flexibility and comprises engineering workshop and offices, staff amenities, canteen, kitchen, executive office floors and sports facilities.

The prominent location adjacent to the proposed Route 3 required a design solution which befitted its situation and an ability to withstand a harsh marine environment whilst remaining within the tight budgetary constraints of the brief. The result reflected a cost effective, buildable design solution with utilitarian finishes able to withstand exposure to the marine environment.

SEE TRANSPORT IN OTHER REGIONS
Europe >North & South America >
Middle East >

/ Asia

Aedas - home

Terms and Conditions

The information contained in, and/or attached to this Website is the property of Aedas unless stated otherwise. It is intended for the use of clients and general public in this format only and should not be reproduced anywhere else as it contains privileged and copyrighted information. Reproduction and/or distribution of any of the contained information/design by anyone without our authorisation is prohibited and may be unlawful. The collection of contained email addresses for mailing lists is also prohibited.

Aedas Architects Limited
Co Registration No: 4347086
Registered office: 5-8 Hardwick Street, London, EC1R 4RG, UK
UK Vat number: GB 789 2533 80
UK Professional Memberships: RIBA